Up to 45% Off Sitewide
Want help? Call: 800-505-1905

For free expert design help, call us: 800-505-1905

Service Change Order

Brand: Blinds.com
  • Pip Measure Icon
  • Pip Delivery Icon
    Estimated Ship Date: 10/07/2026
$0.00

Description

Product Warranty for Window TreatmentsBlinds.com extends the following warranty to the original purchaser of window treatments, which are properly installed in the original window, with proof of purchase. This is in addition to any warranty provided by manufacturers of products sold under brand names. What is covered:
  • Materials and operating mechanisms (including cords and ladders) are covered for 3 years.
  • Manufacturer defects and shipping damage (reported within 14 calendar days)
What is not covered:
  • Variations in texture, construction or color of natural products, slight warping of wood products, and natural color changes to materials that take place over time.
  • Product failure due to any of the following:
    • Improper installation, operation or cleaning
    • Normal wear and tear
    • Excessive exposure to heat, sunlight or moisture
    • Damage from children, pets or insects
    • Alteration of any kind
  • Products that exceed size recommendations or are outside of product specifications

Previously Viewed Products